Hall County, GA data centers Data Centers Near Me. Generated Sep 17, 2026.

Data Centers Near Me

Data centers on record in Hall County, GA

Every campus this county has a public record for, with its status, who it is on record to, and the document each claim rests on. Compiled Sep 17, 2026.

On record

1

Operating

0

Withdrawn or rejected

0

This is a compilation of public records, not a register. A campus can exist without appearing in a filing we read, and a filing can be out of date. Everything here is traceable: the sources section at the back lists the document behind every claim, with the date it carried.

1. What is on record

1 data center campus is on record in Hall County, none of them recorded as operating.

Status What it means Campuses
Proposed Someone has proposed it. Nothing has been approved and nothing is being built. 1

Capacity

Megawatt figures come from two very different places and are never added together. No government record in this county states a capacity. No directory claims a capacity here either.

2. Every campus in Hall County

Campus Status On record to Where Capacity Sources
Project Turbo Proposed Owner not independently traced
Listed as Google by DataCentersExposed. We have not verified that against a filing.
Gainesville not stated 1

A campus shown as county only has a record that names Hall County but no address or coordinate we can stand behind, so it is deliberately not placed on a map or given a distance. It is still counted.

3. Local rules on record

0 of these 1 records cite a government document with a date. The rest come from press reporting collected by a third party and are marked as reported, which means we have not read the ordinance ourselves.

Jurisdiction Recorded as Evidence Date
Hall County restriction Press report Feb 26, 2026

A reported restriction is a claim we are passing on with its source, not a finding. Check the jurisdiction's own minutes before relying on it.

4. Who sells the power

From the utilities' own EIA-861 filings for 2024. A residential rate is not what a data center pays, and it is here as the one published number that lets you compare one utility to another.

Utility Ownership Customers Residential rate
Georgia Power Co Investor Owned 2,452,488 15.49 cents/kWh
Jackson Electric Member Corp - (GA) Cooperative 239,558 11.38 cents/kWh
Sawnee Electric Membership Corporation Cooperative 181,600 11.54 cents/kWh
Habersham Electric Membership Corp Cooperative 35,011 14.02 cents/kWh
City of Buford Municipal 2,985 13.34 cents/kWh

5. How to read this

What an empty row means

A blank is written "not stated" throughout, and it means no record we hold states a value. It does not mean zero. A campus with no capacity shown may well have one; no filing we read published it.

What "on record to" means

A name appears without qualification only where a document chain gets from the site to the company: a permit, a filing, a registration. Where a commercial directory asserts an owner and nothing corroborates it, the row says so. Roughly two thirds of all owner information available for US data centers is of that second kind, and treating it as established is the single most common error in this subject.

What this is not

Not a register, not an official list, not a prediction. Data Centers Near Me is an independent compilation of records that are already public. Coverage is deeper in some states than others, and GA is described on the methodology page.

6. Sources

Every numbered source cited in section 2, in the order it first appears. Dates are the date the document itself carries where it has one, and the date we retrieved it where it does not.

  1. dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Tue, 08 Se
    https://datacentersexposed.com/data/facilities.csv

Data Centers Near Me. Compiled Sep 17, 2026 from the records listed above. The live version of this county, with the map and every source document, is at https://datacentersnearme.org/counties/georgia/hall. Corrections are welcome and are published with the record they change.

Free to read, free to share, no account. If a fact here is wrong, the correction form on the site is the fastest way to get it fixed.