Data Centers Near Me
Data centers on record in Niagara County, NY
Every campus this county has a public record for, with its status, who it is on record to, and the document each claim rests on. Compiled Sep 17, 2026.
On record
20
Operating
11
Withdrawn or rejected
1
This is a compilation of public records, not a register. A campus can exist without appearing in a filing we read, and a filing can be out of date. Everything here is traceable: the sources section at the back lists the document behind every claim, with the date it carried.
1. What is on record
20 data center campuses are on record in Niagara County, 11 of them operating. 1 more is recorded as withdrawn or rejected and is counted separately.
| Status | What it means | Campuses |
|---|---|---|
| Operating | Recorded as in service. | 11 |
| Permitted | A permit or approval is on record. Construction may not have started. | 1 |
| Proposed | Someone has proposed it. Nothing has been approved and nothing is being built. | 8 |
| Withdrawn | The applicant withdrew it. | 1 |
Capacity
Megawatt figures come from two very different places and are never added together. 1,715 MW is stated in a government record, across 8 of 20 campuses. A further 1,378 MW is claimed by commercial directories across 10 of 20, which we repeat with attribution and do not treat as measured.
2. Every campus in Niagara County
| Campus | Status | On record to | Where | Capacity | Sources |
|---|---|---|---|---|---|
| Verizon - Project Oasis | Withdrawn | Owner not resolved | County only, no site located | 75 MW | 1 |
| Blockfusion data center | Operating | Likely Blockfusion One circumstantial signal, not a document chain. | 1999 Frontier Avenue | not stated | 2, 3 |
| Blockfusion Niagra Falls | Operating | Owner not independently traced Listed as Blockfusion USA Inc. by DataCentersExposed. We have not verified that against a filing. | 5380 Frontier Avenue | not stated | 2, 3 |
| Digihost load | Operating | Owner not resolved | County only, no site located | 50 MW | 1 |
| Fluidstack Lake Mariner | Operating | Owner not independently traced Listed as TeraWulf Inc. by DataCentersExposed. We have not verified that against a filing. | BARKER | not stated | 3 |
| H5 Data Centers Buffalo Campus | Operating | Owner not resolved | Lockport | not stated | 3, 4 |
| Hut 8 Alpha (Crypto mining) | Operating | Owner not resolved | street precision | not stated | 4 |
| Lake Mariner Data Center | Operating | Owner not independently traced Listed as Google by DataCentersExposed. We have not verified that against a filing. | Barker | not stated | 3 |
| Lake Mariner WULF Den | Operating | Owner not resolved | street precision | not stated | 4 |
| North Tonawanda Data Center | Operating | Owner not resolved | North Tonawanda | not stated | 3 |
| Somerset Load | Operating | Owner not resolved | County only, no site located | 250 MW | 1 |
| US Bitcoin data center | Operating | Likely US Bitcoin One circumstantial signal, not a document chain. | rooftop precision | not stated | 2, 3 |
| North East Data LLC | Permitted | Owner not resolved | 5380 FRONTIER AVE | not stated | 5, 6 |
| Anthropic Lake Mariner | Proposed | Owner not resolved | Barker (Somerset) | not stated | 7, 8 |
| DigiHost North Tonawanda AI Data Center | Proposed | Owner not independently traced Listed as Digi Power X by DataCentersExposed. We have not verified that against a filing. | North Tonawanda | not stated | 3 |
| Globe Digital Holdings - 1 | Proposed | Owner not resolved | County only, no site located | 200 MW | 1 |
| Lake Mariner CB-1 | Proposed | Owner not resolved | street precision | not stated | 4 |
| Lake Mariner Data II | Proposed | Owner not resolved | County only, no site located | 250 MW | 1 |
| Niagara Digital Campus | Proposed | Owner not resolved | Niagara Falls | 140 MW | 1, 3, 4 |
| North East Data LLC Data Center | Proposed | Owner not resolved | County only, no site located | 500 MW | 1 |
| Wulf Compute Data Center II | Proposed | Owner not resolved | County only, no site located | 250 MW | 1 |
A campus shown as county only has a record that names Niagara County but no address or coordinate we can stand behind, so it is deliberately not placed on a map or given a distance. It is still counted.
3. Who sells the power
From the utilities' own EIA-861 filings for 2024. A residential rate is not what a data center pays, and it is here as the one published number that lets you compare one utility to another.
| Utility | Ownership | Customers | Residential rate |
|---|---|---|---|
| Niagara Mohawk Power Corp. | Investor Owned | 1,532,294 | 16.67 cents/kWh |
| New York State Elec & Gas Corp | Investor Owned | 792,300 | 17.75 cents/kWh |
4. How to read this
What an empty row means
A blank is written "not stated" throughout, and it means no record we hold states a value. It does not mean zero. A campus with no capacity shown may well have one; no filing we read published it.
What "on record to" means
A name appears without qualification only where a document chain gets from the site to the company: a permit, a filing, a registration. Where a commercial directory asserts an owner and nothing corroborates it, the row says so. Roughly two thirds of all owner information available for US data centers is of that second kind, and treating it as established is the single most common error in this subject.
What this is not
Not a register, not an official list, not a prediction. Data Centers Near Me is an independent compilation of records that are already public. Coverage is deeper in some states than others, and NY is described on the methodology page.
5. Sources
Every numbered source cited in section 2, in the order it first appears. Dates are the date the document itself carries where it has one, and the date we retrieved it where it does not.
- NYISO Interconnection Queue as of 2026-07-31 · Jul 31, 2026
https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-07312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1786563693134 - Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0 · Jul 28, 2026
https://overpass.kumi.systems/api/interpreter - dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Tue, 08 Se
https://datacentersexposed.com/data/facilities.csv - Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) · Sep 8, 2026 (retrieved)
https://cleanview.co/data-centers/ - EPA ECHO Exporter, all facilities (weekly refresh) · Sun, 06 Se
https://echo.epa.gov/files/echodownloads/echo_exporter.zip - Census batch geocoder result, EPA area-precision batch 0 · Sep 8, 2026 (retrieved)
https://geocoding.geo.census.gov/geocoder/geographies/addressbatch - Source cited by AI GridWatch for Anthropic Lake Mariner: https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025- · Sep 8, 2026 (retrieved)
https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results - agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) · Tue, 08 Se
https://aigridwatch.com/data/projects.csv
Data Centers Near Me. Compiled Sep 17, 2026 from the records listed above. The live version of this county, with the map and every source document, is at https://datacentersnearme.org/counties/new-york/niagara. Corrections are welcome and are published with the record they change.