Connecticut
Data centers in Southeastern Connecticut Planning Region
2 campuses are on record here. 1 more was withdrawn or rejected and is kept for the record.
Operating
1
Proposed
1
Withdrawn
1
Every campus on record
Open the printable report for Southeastern Connecticut Planning Region
| Campus | Status | Owner | Capacity |
|---|---|---|---|
| Lumen New London directory listing, unverified | Operating (inferred) | not traced | not stated |
| NE Edge Millstone Data Center directory listing, unverified | Proposed (inferred) | not resolved | not stated |
| GotSpace Bozrah Data Center directory listing, unverified | Withdrawn (inferred) | not resolved | not stated |
Capacity
Megawatts are only as good as the source. These two lines are never added together.
- On record from a filing
- not stated
- 0 of 3 campuses
- As reported by directories
- 400 MW
- 2 of 3 campuses, unverified