Texas
Data centers in Bexar County
36 campuses are on record here.
Operating
25
Under construction
3
Permitted
1
Proposed
7
Every campus on record
Open the printable report for Bexar County
| Campus | Status | Owner | Capacity |
|---|---|---|---|
| Amazon | Operating (inferred) | Amazon (AWS) | not stated |
| Amazon AWS SAT - 12807 Donop | Operating (inferred) | Amazon (AWS) | not stated |
| CHRISTUS Health data center | Operating (inferred) | likely CHRISTUS Health | not stated |
| Citicorp Data Systems directory listing, unverified | Operating (inferred) | not resolved | not stated |
| CyrusOne San Antonio I | Operating (inferred) | likely CyrusOne | not stated |
| CyrusOne San Antonio IV | Operating (inferred) | likely CyrusOne | not stated |
| CyrusOne SAT10 & SAT11 | Operating (inferred) | likely CyrusOne | not stated |
| EX West Green Data Center | Operating (inferred) | not resolved | not stated |
| Gvtc | Operating (inferred) | likely Gvtc | not stated |
| H5 Data Centers San Antonio | Operating (inferred) | H5 Data Centers | not stated |
| HEB data center | Operating (inferred) | likely HEB | not stated |
| Lowe's Data Center | Operating (inferred) | likely Lowe's | not stated |
| Lumen San Antonio 1 | Operating (inferred) | not traced | not stated |
| Lumen San Antonio 2 | Operating (inferred) | likely Lumen Technologies | not stated |
| Microsoft | Operating (inferred) | Microsoft | not stated |
| Microsoft | Operating (inferred) | Microsoft | not stated |
| Microsoft San Antonio (Quarry) directory listing, unverified | Operating (inferred) | not traced | not stated |
| Microsoft SAT14 - Building 1 | Operating (inferred) | not resolved | not stated |
| Microsoft SAT14 - Building 2 | Operating (inferred) | likely Valero | not stated |
| QTS San Antonio II | Operating (inferred) | QTS | not stated |
| SAT2 SAT3 SAT4 | Operating (inferred) | not traced | not stated |
| Stream Data Center: San Antonio III - VII | Operating (inferred) | Microsoft | not stated |
| Texas Cryptologic Center | Operating (inferred) | likely National Security Agency | not stated |
| Vantage Data Centers TX22 | Operating (inferred) | likely Vantage Data Centers | not stated |
| Vantage San Antonio I | Operating (inferred) | Vantage Data Centers | not stated |
| AWS Rockfish 1 directory listing, unverified | Under construction (inferred) | not resolved | not stated |
| AWS Rockfish 3 directory listing, unverified | Under construction (inferred) | not resolved | not stated |
| Stream San Antonio Campus directory listing, unverified | Under construction (inferred) | not traced | not stated |
| Vantage Data Center TX2 | Permitted | Vantage Data Centers | not stated |
| American Tower Data Center - Highway 90\n | Proposed (inferred) | not resolved | not stated |
| AWS Lavender Hill - Building 1 | Proposed (inferred) | Amazon (AWS) | not stated |
| Black Mountain Power San Antonio directory listing, unverified | Proposed (inferred) | not traced | not stated |
| CloudHQ SAT-1 directory listing, unverified | Proposed (inferred) | not resolved | not stated |
| Microsoft SAT14 | Proposed | likely Microsoft | not stated |
| Microsoft SAT40 | Proposed | likely Microsoft | not stated |
| QTS San Antonio III | Proposed (inferred) | QTS | not stated |
Capacity
Megawatts are only as good as the source. These two lines are never added together.
- On record from a filing
- not stated
- 0 of 36 campuses
- As reported by directories
- 1,571 MW
- 19 of 36 campuses, unverified