Texas
Data centers in Harris County
20 campuses are on record here.
Operating
20
Every campus on record
Open the printable report for Harris County
| Campus | Status | Owner | Capacity |
|---|---|---|---|
| Alpheus Houston (777 Walker Street) directory listing, unverified | Operating (inferred) | not resolved | not stated |
| CyrusOne HOU3 directory listing, unverified | Operating (inferred) | not resolved | not stated |
| CyrusOne HOU4 directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Data Foundry | Operating (inferred) | not resolved | not stated |
| Data Foundry Houston 1 directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Databank Houston Galleria (HOU5) directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Databank Houston West (HOU1) (HOU2) directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Digital Realty HOU (12001 North Freeway) directory listing, unverified | Operating (inferred) | not traced | not stated |
| DXC Technology data center | Operating (inferred) | likely DXC Technology | not stated |
| DXC Technology data center | Operating (inferred) | likely DXC Technology | not stated |
| EdgeConneX HOU01 | Operating (inferred) | EdgeConneX | not stated |
| Energy Control & Data Center directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Equinix HO1 - Houston directory listing, unverified | Operating (inferred) | not traced | not stated |
| INAP Houston directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Quasar Data Center directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Rice Data Center | Operating (inferred) | not traced | not stated |
| Skybox Houston One | Operating (inferred) | likely Skybox | not stated |
| TRG Houston Data Center directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Unnamed data center (way/587103676) | Operating (inferred) | not resolved | not stated |
| Westway Park I Data Center: HOU 1 directory listing, unverified | Operating (inferred) | not resolved | not stated |
Capacity
Megawatts are only as good as the source. These two lines are never added together.
- On record from a filing
- not stated
- 0 of 20 campuses
- As reported by directories
- 195 MW
- 9 of 20 campuses, unverified