Texas
Data centers in Milam County
7 campuses are on record here.
Operating
2
Under construction
1
Proposed
4
Every campus on record
Open the printable report for Milam County
| Campus | Status | Owner | Capacity |
|---|---|---|---|
| Bitdeer Rockdale directory listing, unverified | Operating (inferred) | not traced | not stated |
| Riot Platforms Rockdale directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Stargate Milam County (SB Energy) directory listing, unverified | Under construction (inferred) | not traced | not stated |
| MIlan County Data Center directory listing, unverified | Proposed (inferred) | not traced | not stated |
| Open AI/ SoftBank "Freebird" directory listing, unverified | Proposed (inferred) | not resolved | not stated |
| OpenAI Stargate Milam | Proposed (inferred) | likely OpenAI | not stated |
| Stargate Milam - Building 2 directory listing, unverified | Proposed (inferred) | not resolved | not stated |
Capacity
Megawatts are only as good as the source. These two lines are never added together.
- On record from a filing
- not stated
- 0 of 7 campuses
- As reported by directories
- 4,263 MW
- 5 of 7 campuses, unverified