Data centers in Travis County

22 campuses are on record here.

Operating

18

Under construction

1

Permitted

1

Proposed

2

All 22 on record here have a coordinate.

Every campus on record

Open the printable report for Travis County

Data centers in Travis County
Campus Status Owner Capacity
1011 San Jacinto directory listing, unverified Operating (inferred) not resolved not stated
Austin Data Center: AUS1 directory listing, unverified Operating (inferred) not resolved not stated
Cogent Austin directory listing, unverified Operating (inferred) not traced not stated
Core Scientific Austin directory listing, unverified Operating (inferred) not resolved not stated
Cortex supercomputer Operating (inferred) not resolved not stated
CyrusOne Austin Data Center II Operating (inferred) not traced not stated
Data Foundry - Texas 1 Operating (inferred) not resolved not stated
Data Foundry Austin 1 Data Center Operating (inferred) not resolved not stated
Digital Realty Austin AUS11 Operating (inferred) Digital Realty not stated
Digital Realty Austin Campus directory listing, unverified Operating (inferred) not traced not stated
Element Critical Operating (inferred) not traced not stated
LightEdge Austin I Operating (inferred) not resolved not stated
LightEdge Austin II Operating (inferred) not resolved not stated
Lumen Austin 1 Operating (inferred) Lumen Technologies not stated
Lumen Austin 3 Operating (inferred) Lumen Technologies not stated
Oracle-Austin Data Center Operating (inferred) Oracle not stated
Stream Data Center: Austin I directory listing, unverified Operating (inferred) not resolved not stated
Thin-nology Operating (inferred) not resolved not stated
Skybox Austin Data Center 1 directory listing, unverified Under construction (inferred) not resolved not stated
Meta ATX9025 Permitted (inferred) Meta not stated
Cielo Mustang Ridge Data Center directory listing, unverified Proposed (inferred) not resolved not stated
Project Raptor directory listing, unverified Proposed (inferred) not resolved not stated

Capacity

Megawatts are only as good as the source. These two lines are never added together.

On record from a filing
not stated
0 of 22 campuses
As reported by directories
820 MW
7 of 22 campuses, unverified