Stillwater data center campus (Panhandle Road)
Lovejoy (Clayton County), Clayton County, Georgia
Approximate area
The applicant withdrew it.
Status inferred from agw source doc (Tue, 08 Se). No filing states it in as many words.
- Status
- Withdrawn (inferred)
- Owner
- Owner not resolved
- Capacity
- 1,250 MW
- Location known to
- Approximate area
- County
- Clayton County
- State
- Georgia
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Stillwater data center campus (Panhandle Road) is on record as withdrawn in Clayton County, Georgia. A record puts its capacity at 1,250 MW. 74 other campuses are on record within 25 miles, 4 of them within 5 miles. The nearest is 2.9 mi away, measured between approximate points.
Nearest of each kind: Operating 12.3 mi Under construction 8.4 mi Permitted 12.7 mi Proposed 2.9 mi
Nearest campuses on record
- 2.9 mi approximate
Proposed · Clayton County, GA
- 4.6 mi approximate
Proposed · Henry County, GA
- 4.7 mi approximate
Proposed · Henry County, GA
- 4.9 mi approximate
Proposed · Henry County, GA
- 5.5 mi approximate
Proposed · Henry County, GA
- 6.9 mi approximate
Proposed · Henry County, GA
What is on record
Owner
Owner not resolved
Filed by: The Stillwater Group, LLC
- Capacity
- 1,250 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- The Stillwater Group, LLC
How the status changed
- Withdrawn Aug 14, 2026 inferred
AI GridWatch stage/outcome: withdrawn|withdrawn; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Stillwater data center campus (Panhandle Road): https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/ US-GA | Context | url=https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/ | Aug 14, 2026 last changed on the server |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=lovejoy-panhandle-road-data-center | Aug 14, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.