Skip to the content
Data Centers Near Me
Proposed (inferred) Decatur County · IN

Jumping Bison Greensburg Data Center

Greensburg, Decatur County, Indiana

Approximate area

Someone has proposed it. Nothing has been approved and nothing is being built.

Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Proposed (inferred)
Owner
Owner not resolved
Capacity
50 MW directory claim
Location known to
Approximate area
County
Decatur County
State
Indiana
Electric utility
Not identified
Grid operator
MISO

Location and nearby

Jumping Bison Greensburg Data Center is on record as proposed in Decatur County, Indiana. A directory lists its capacity at 50 MW; no filing we hold states a figure. 3 other campuses are on record within 25 miles. The nearest is 14.6 mi away, measured between approximate points.

Nearest of each kind: Operating 24.3 mi Permitted 24.2 mi Proposed 14.6 mi

Nearest campuses on record

What is on record

Owner

Owner not resolved

Capacity
50 MW as reported by cleanview, not from a filing
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Jumping Bison LLC Data Center

How the status changed

  1. Proposed Jun 23, 2026 inferred

    DCE status 'proposed'

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  2. Proposed Sep 8, 2026 inferred

    Cleanview status 'Planned'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

About this data

Evidence

Directory listing only

One or more public directories list it. We have not matched it to a filing.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.

Independent sources

1

directory. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=2000 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=jumping-bison-llc-data-center Jun 23, 2026 last changed on the server

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Decatur County

Each time we refresh the public records and a new campus appears in Decatur County, you get one short email naming it, with the document behind it.

Explore more