Cloverdale Solar Farm (EnergyRe)
Putnam County, Putnam County, Indiana
Approximate area
The applicant withdrew it.
Status inferred from agw source doc (Tue, 08 Se). No filing states it in as many words.
- Status
- Withdrawn (inferred)
- Owner
- Owner not resolved
- Capacity
- 150 MW
- Location known to
- Approximate area
- County
- Putnam County
- State
- Indiana
- Electric utility
- Not identified
- Grid operator
- MISO
Location and nearby
Cloverdale Solar Farm (EnergyRe) is on record as withdrawn in Putnam County, Indiana. A record puts its capacity at 150 MW. 4 other campuses are on record within 25 miles. The nearest is 17.8 mi away, measured between approximate points.
Nearest of each kind: Operating 23.7 mi Proposed 17.8 mi
Nearest campuses on record
- 17.8 mi approximate
Proposed · Clay County, IN
- 18.6 mi approximate
Proposed · Morgan County, IN
- 18.6 mi approximate
Google data center, Morgan County, Indiana
Proposed · Morgan County, IN
- 23.7 mi approximate
Operating · Hendricks County, IN
What is on record
Owner
Owner not resolved
Filed by: EnergyRe
- Capacity
- 150 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- EnergyRe
How the status changed
- Withdrawn Sep 2, 2026 inferred
AI GridWatch stage/outcome: withdrawn|withdrawn; source press
agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=energyre-cloverdale-solar-in | Sep 2, 2026 last changed on the server |
Free email alerts
Know first when a data center is recorded in Putnam County
Each time we refresh the public records and a new campus appears in Putnam County, you get one short email naming it, with the document behind it.