Abei Energy data center proposal (rezoning request)
Starke County, Starke County, Indiana
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Approximate area
- County
- Starke County
- State
- Indiana
- Electric utility
- Not identified
- Grid operator
- MISO
Location and nearby
Abei Energy data center proposal (rezoning request) is on record as proposed in Starke County, Indiana. 9 other campuses are on record within 25 miles. The nearest is 11.2 mi away, measured between approximate points.
Nearest of each kind: Operating 24.2 mi Proposed 11.2 mi
Nearest campuses on record
- 11.2 mi approximate
Proposed · LaPorte County, IN
- 16.6 mi approximate
Microsoft La Porte - Building 15
Proposed · LaPorte County, IN
- 17.3 mi approximate
Microsoft La Porte - Building 7
Proposed · LaPorte County, IN
- 17.3 mi approximate
Microsoft La Porte - Building 1
Proposed · LaPorte County, IN
- 17.4 mi approximate
Proposed · LaPorte County, IN
- 21.0 mi approximate
AWS Wheatfield Campus - Building 1
Proposed · Jasper County, IN
What is on record
Owner
Owner not resolved
Filed by: Abei Energy (data center division)
- Capacity
- not stated
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Abei Energy (data center division)
How the status changed
- Proposed Sep 2, 2026 inferred
AI GridWatch stage/outcome: blocked by ban|moratorium; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Abei Energy data center proposal (rezoning request): https://wkvi.com/2025/11/starke-county-commissioners-discuss-data-centers-with-citizens/ US-IN | Context | url=https://wkvi.com/2025/11/starke-county-commissioners-discuss-data-centers-with-citizens/ | Sep 2, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=abei-energy-data-center-starke-in | Sep 2, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Starke County
Each time we refresh the public records and a new campus appears in Starke County, you get one short email naming it, with the document behind it.