Geronimo Power Data Center
Reading, Nobles County, Minnesota
Approximate area
A decision-maker refused it.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Rejected (inferred)
- Owner
- Owner not resolved
- Capacity
- 400 MW directory claim
- Location known to
- Approximate area
- County
- Nobles County
- State
- Minnesota
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Geronimo Power Data Center is on record as rejected in Nobles County, Minnesota. A directory lists its capacity at 400 MW; no filing we hold states a figure. 1 other campus is on record within 25 miles. The nearest is 10.4 mi away, measured between approximate points.
Nearest of each kind: Proposed 10.4 mi
Nearest campuses on record
- 10.4 mi approximate
Proposed · Nobles County, MN
What is on record
Owner
Owner not resolved
- Capacity
- 400 MW as reported by dce, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Rejected Jun 18, 2026 inferred
DCE status 'blocked'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=geronimo-power-data-center | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Nobles County
Each time we refresh the public records and a new campus appears in Nobles County, you get one short email naming it, with the document behind it.