H5 Minneapolis
1125 Energy Park Drive
Building outline
Recorded as in service.
Status inferred from osm footprint (Tue, 08 Se). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Likely H5 Data Centers
- Capacity
- 8 MW directory claim
- Location known to
- Building outline
- County
- Ramsey County
- State
- Minnesota
- Electric utility
- Not identified
- Grid operator
- MISO
Location and nearby
H5 Minneapolis is on record as operating in Ramsey County, Minnesota. A directory lists its capacity at 8 MW; no filing we hold states a figure. 35 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 4.1 mi away.
Nearest of each kind: Operating 5.2 mi Under construction 10.0 mi Permitted 4.1 mi Proposed 9.7 mi
Nearest campuses on record
- 4.1 mi
Permitted · Hennepin County, MN
- 5.2 mi
Operating · Hennepin County, MN
- 5.6 mi
Hb Fuller Co - Data Center - Arden Hills
Permitted · Ramsey County, MN
- 5.8 mi approximate
Operating · Hennepin County, MN
- 6.1 mi approximate
Operating · Hennepin County, MN
- 6.6 mi
Operating · Hennepin County, MN
What is on record
Owner
Likely H5 Data Centers
One circumstantial signal, not a document chain.
What the signal was
-
OSM operator tag
H5
Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0 · Dec 23, 2025
- Address on file
- 1125 Energy Park Drive
- Capacity
- 8 MW as reported by dce, not from a filing
- Building area
- 108,201 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- H5 · H5 Data Centers
How the status changed
- Operating Dec 23, 2025 inferred
osm footprint
Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0
- Operating Jun 18, 2026 inferred
DCE status 'operating'
About this data
Evidence
Map footprint and directories
An OpenStreetMap footprint plus one or more directories. No filing behind it.
Location known to
Building outline
A mapped building outline.
Independent sources
2
directory, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0 US | Primary | osm=way/131874718 | Dec 23, 2025 stated in the file |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=h5-minneapolis-osmway-131874718 | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Ramsey County
Each time we refresh the public records and a new campus appears in Ramsey County, you get one short email naming it, with the document behind it.