Skip to the content
Data Centers Near Me
Permitted (inferred) Jasper County · MO

Wildwood Ranch data center

Joplin (Jasper County), Jasper County, Missouri

Approximate area

A permit or approval is on record. Construction may not have started.

Status inferred from agw source doc (Wed, 18 Fe). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Permitted (inferred)
Owner
Owner not resolved
Capacity
600 MW
Location known to
Approximate area
County
Jasper County
State
Missouri
Electric utility
Not identified
Grid operator
SPP

Location and nearby

Wildwood Ranch data center is on record as permitted in Jasper County, Missouri. A record puts its capacity at 600 MW. 2 other campuses are on record within 25 miles. The nearest is 5.0 mi away, measured between approximate points.

Nearest of each kind: Proposed 5.0 mi

Nearest campuses on record

What is on record

Owner

Owner not resolved

Filed by: Wildwood Ranch, LLC

Capacity
600 MW from agw
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
ReLoad (Scale Microgrids) · Wildwood Ranch, LLC

How the status changed

  1. Permitted Aug 23, 2026 inferred

    AI GridWatch stage/outcome: approved|approved; source press

    Source cited by AI GridWatch for Wildwood Ranch data center: https://www.koamnewsnow.com/news/joplin-news-first/proposed-joplin-data-center-the-votes-are-in-joplin-city-council-meet

About this data

Evidence

Directory listing only

One or more public directories list it. We have not matched it to a filing.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway.

Independent sources

1

tracker lead. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Source cited by AI GridWatch for Wildwood Ranch data center: https://www.koamnewsnow.com/news/joplin-news-first/proposed-joplin-data-center-the-votes-are-in-joplin-city-council-meet US-MO Context url=https://www.koamnewsnow.com/news/joplin-news-first/proposed-joplin-data-center-the-votes-are-in-joplin-city-council-meeting-feb-17-2026/article_8fa0ac8a-2a8b-4a42-a00a-89d5449db1be.html Aug 23, 2026 last changed on the server
agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US Context id=wildwood-ranch-joplin-mo Aug 23, 2026 last changed on the server

AI GridWatch (aigridwatch.com), CC BY 4.0.

Free email alerts

Know first when a data center is recorded in Jasper County

Each time we refresh the public records and a new campus appears in Jasper County, you get one short email naming it, with the document behind it.

Explore more