Midtown Data Center
St. Louis (Midtown), St. Louis city, Missouri
Approximate area
A permit or approval is on record. Construction may not have started.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Permitted (inferred)
- Owner
- Owner not resolved
- Capacity
- 120 MW
- Location known to
- Approximate area
- County
- St. Louis city
- State
- Missouri
- Electric utility
- Not identified
- Grid operator
- MISO
Location and nearby
Midtown Data Center is on record as permitted in St. Louis city, Missouri. A record puts its capacity at 120 MW. 15 other campuses are on record within 25 miles, 9 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Operating 1.0 mi Proposed 0.4 mi
Nearest campuses on record
- 0.4 mi approximate
Proposed · St. Charles County, MO
- 0.5 mi approximate
Proposed · St. Louis city, MO
- 1.0 mi approximate
Tierpoint St. Louis - Locust Data Center
Operating · St. Louis city, MO
- 1.1 mi approximate
Operating · St. Louis city, MO
- 1.3 mi approximate
1831 Chestnut Condominium Data Center
Operating · St. Louis County, MO
- 1.4 mi approximate
Operating · St. Louis city, MO
What is on record
Owner
Owner not resolved
- Capacity
- 120 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Permitted Aug 19, 2026 inferred
AI GridWatch stage/outcome: approved|approved; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Midtown Data Center: https://www.stlpr.org/health-science-environment/2026-07-30/st-louis-board-allows-data-center-near-armory-to-move-forwar US-MO | Context | url=https://www.stlpr.org/health-science-environment/2026-07-30/st-louis-board-allows-data-center-near-armory-to-move-forward-with-new-rules | Aug 19, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=midtown-armory-st-louis-mo | Aug 19, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in St. Louis city
Each time we refresh the public records and a new campus appears in St. Louis city, you get one short email naming it, with the document behind it.