xAI Macrohardrr
Stateline Road West
Building outline
Recorded as in service.
Status inferred from osm footprint+epa permit (Sun, 06 Se). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Likely x-corp
- Capacity
- 500 MW directory claim
- Location known to
- Building outline
- County
- DeSoto County
- State
- Mississippi
- Electric utility
- Not identified
- Grid operator
- MISO
Location and nearby
xAI Macrohardrr is on record as operating in DeSoto County, Mississippi. A directory lists its capacity at 500 MW; no filing we hold states a figure. 17 other campuses are on record within 25 miles, 3 of them within 5 miles. The nearest is 0.31 mi away.
Nearest of each kind: Operating 0.31 mi Under construction 13.3 mi Permitted 6.1 mi Proposed 5.3 mi
Nearest campuses on record
- 0.31 mi
Operating · Shelby County, TN
- 0.6 mi approximate
Operating · Shelby County, TN
- 0.7 mi approximate
Operating · Shelby County, TN
- 5.3 mi approximate
Proposed · Shelby County, TN
- 5.4 mi approximate
Proposed · Shelby County, TN
- 6.1 mi
Permitted · Shelby County, TN
What is on record
Owner
Likely x-corp
One circumstantial signal, not a document chain.
What the signal was
-
OSM operator tag
xAI
Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0 · Dec 31, 2025
Filed by: MACROHARDER
- Address on file
- Stateline Road West
- Capacity
- 500 MW as reported by dce, not from a filing
- Building area
- 812,955 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- MACROHARDER · xAI · xAI Colossus 2 — Southaven Turbine Plant · xAI Corp.
How the status changed
- Operating Dec 31, 2025 inferred
osm footprint
Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0
- Operating Dec 31, 2025 inferred
OSM footprint plus EPA permit
Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0
- Operating Jun 17, 2026 inferred
DCE status 'operating'
- Permitted Sep 6, 2026 inferred
epa frs active 518210
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Building outline
A mapped building outline.
Independent sources
3
directory, federal permit, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
3 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Overpass data_center query, tile conus-c2 bbox 24.0,-95.0,50.0,-85.0 US | Primary | osm=way/1077131079 | Dec 31, 2025 stated in the file |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=xai-macrohardrr-osmway-1077131079 | Jun 17, 2026 last changed on the server |
| EPA ECHO Exporter, all facilities (weekly refresh) US | Primary | DFR_FID=MSR000111534 | Sep 6, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in DeSoto County
Each time we refresh the public records and a new campus appears in DeSoto County, you get one short email naming it, with the document behind it.