Project Double Reed (Stream US Data Centers at STAMP)
Alabama (Genesee County), Genesee County, New York
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 600 MW
- Location known to
- Approximate area
- County
- Genesee County
- State
- New York
- Electric utility
- Not identified
- Grid operator
- NYISO
Location and nearby
Project Double Reed (Stream US Data Centers at STAMP) is on record as proposed in Genesee County, New York. A record puts its capacity at 600 MW. 12 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 1.0 mi away, measured between approximate points.
Nearest of each kind: Operating 18.5 mi Proposed 1.0 mi
Nearest campuses on record
- 1.0 mi approximate
Proposed · Genesee County, NY
- 17.8 mi approximate
Proposed · Niagara County, NY
- 18.5 mi approximate
Unnamed data center (way/916148870)
Operating · Erie County, NY
- 18.7 mi approximate
H5 Data Centers Buffalo Campus
Operating · Niagara County, NY
- 20.3 mi approximate
Operating · Niagara County, NY
- 20.7 mi approximate
I-Evolve Technology Datacenter Amherst
Operating · Erie County, NY
What is on record
Owner
Owner not resolved
Filed by: Stream US Data Centers LLC
- Capacity
- 600 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Stream Data Centers · Stream US Data Centers LLC
How the status changed
- Proposed Aug 14, 2026 inferred
AI GridWatch stage/outcome: awaiting decision|; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Project Double Reed (Stream US Data Centers at STAMP): https://videonewsservice.net/index.php/2026/06/17/genesee-county-alabama-planning-board-expected-to-vote-july-6th-on-dat US-NY | Context | url=https://videonewsservice.net/index.php/2026/06/17/genesee-county-alabama-planning-board-expected-to-vote-july-6th-on-data-center-site-plan-approval/ | Aug 14, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=stamp-double-reed-alabama-ny | Aug 14, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Genesee County
Each time we refresh the public records and a new campus appears in Genesee County, you get one short email naming it, with the document behind it.