Skip to the content
Data Centers Near Me
Permitted (inferred) Wasco County · OR

Design LLC

4200 COLUMBIA ROAD

Exact coordinate

A permit or approval is on record. Construction may not have started.

Status inferred from epa frs active 518210 (Sun, 06 Se). No filing states it in as many words.

Get directions
A coordinate as filed with a government agency. Other campuses on record nearby are drawn around it.
Status
Permitted (inferred)
Owner
Owner not resolved
Capacity
not stated
Location known to
Exact coordinate
County
Wasco County
State
Oregon
Electric utility
Not identified
Grid operator
not stated

Location and nearby

Design LLC is on record as permitted in Wasco County, Oregon. 6 other campuses are on record within 25 miles, 6 of them within 5 miles. The nearest is 0.10 mi away.

Nearest of each kind: Operating 0.10 mi Permitted 0.24 mi Proposed 2.5 mi

Nearest campuses on record

What is on record

Owner

Owner not resolved

Filed by: DESIGN LLC

Address on file
4200 COLUMBIA ROAD
Capacity
not stated
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
DESIGN LLC · DLS

How the status changed

  1. Permitted Sep 6, 2026 inferred

    epa frs active 518210

    EPA ECHO Exporter, all facilities (weekly refresh)

  2. Permitted Sep 6, 2026 inferred

    epa frs active 518210

    EPA ECHO Exporter, all facilities (weekly refresh)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Exact coordinate

A coordinate as filed with a government agency.

Independent sources

1

federal permit. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110040447816 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110071163059 Sep 6, 2026 last changed on the server

Free email alerts

Know first when a data center is recorded in Wasco County

Each time we refresh the public records and a new campus appears in Wasco County, you get one short email naming it, with the document behind it.

Explore more