Skip to the content
Data Centers Near Me
Operating (inferred) Washington County · OR

EdgeConneX - Portland

6501 Northeast Bennett Street

Building outline

Recorded as in service.

Status inferred from osm footprint+epa permit (Sun, 06 Se). No filing states it in as many words.

Get directions
Drawn at the mapped building outline. Other campuses on record nearby are drawn around it.
Status
Operating (inferred)
Owner
EdgeConneX
Capacity
29 MW directory claim
Location known to
Building outline
County
Washington County
State
Oregon
Electric utility
Not identified
Grid operator
CAISO

Location and nearby

EdgeConneX - Portland is on record as operating in Washington County, Oregon. A directory lists its capacity at 29 MW; no filing we hold states a figure. 39 other campuses are on record within 25 miles, 28 of them within 5 miles. The nearest is 0.27 mi away.

Nearest of each kind: Operating 0.27 mi Under construction 1.3 mi Proposed 0.4 mi

Nearest campuses on record

What is on record

Owner

EdgeConneX Strong

The chain
  1. permittee name as filed with EPA

    EDGECONNEX POR03 DATA CENTER, SUNSET CORPORATE PARK, LLC

    EPA ECHO Exporter, all facilities (weekly refresh) · Sep 6, 2026

Filed by: EDGECONNEX POR03 DATA CENTER, SUNSET CORPORATE PARK, LLC

Address on file
6501 Northeast Bennett Street
Capacity
29 MW as reported by cleanview, not from a filing
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
EDGECONNEX POR03 DATA CENTER, SUNSET CORPORATE PARK, LLC · EdgeConneX · EdgeConneX POR01 · EdgeConneX POR02 · EdgeConneX POR03 · EdgeConneX POR04 and 1 more

How the status changed

  1. Operating May 24, 2026 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  2. Operating May 24, 2026 inferred

    OSM footprint plus EPA permit

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  3. Operating Jun 14, 2026 inferred

    DCE status 'mapped' (located only, single source)

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  4. Proposed Sep 8, 2026 inferred

    Cleanview status 'Planned'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  5. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  6. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  7. Proposed Sep 8, 2026 inferred

    Cleanview status 'Planned'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  8. Permitted Sep 6, 2026 inferred

    epa frs active 518210

    EPA ECHO Exporter, all facilities (weekly refresh)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Building outline

A mapped building outline.

Independent sources

3

directory, federal permit, osm footprint. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

7 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/1019812125 May 24, 2026 stated in the file
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=1010 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=1199 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=1251 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=4148 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=edgeconnex-portland-osmway-1019812125 Jun 14, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110071661280 Sep 6, 2026 last changed on the server

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Washington County

Each time we refresh the public records and a new campus appears in Washington County, you get one short email naming it, with the document behind it.

Explore more