Robena Data Center
Monongahela Township, Greene County, Pennsylvania
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not independently traced
- Capacity
- 910 MW directory claim
- Location known to
- Approximate area
- County
- Greene County
- State
- Pennsylvania
- Electric utility
- FirstEnergy Pennsylvania Electric Co
- Grid operator
- PJM
Location and nearby
Robena Data Center is on record as proposed in Greene County, Pennsylvania. A directory lists its capacity at 910 MW; no filing we hold states a figure. 2 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Proposed 0.4 mi
Nearest campuses on record
- 0.4 mi approximate
Proposed · Greene County, PA
- 11.5 mi approximate
NETL Computational Science & Engineering Center
Proposed · Monongalia County, WV
What is on record
Owner
Owner not independently traced
Listed as International Electric Power by Cleanview, DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
International Electric Power
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 21, 2026
Filed by: International Electric Power
- Capacity
- 910 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- FirstEnergy Pennsylvania Electric Co
- Also recorded as
- International Electric Power · Robena Mine Data Center (Project Hummingbird)
How the status changed
- Under construction Jun 21, 2026 inferred
DCE status 'under_construction'
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=2020 | Sep 8, 2026 retrieved by us |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=robena-mine-data-center-project-hummingbird | Jun 21, 2026 last changed on the server |
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.