Proposed (inferred) Union County · SC

Volt Edge Energy Project Alpaca

Union, Union County, South Carolina

Approximate area

Someone has proposed it. Nothing has been approved and nothing is being built.

Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Proposed (inferred)
Owner
Owner not independently traced
Capacity
49 MW directory claim
Location known to
Approximate area
County
Union County
State
South Carolina
Electric utility
Not identified
Grid operator
not stated

Location and nearby

Volt Edge Energy Project Alpaca is on record as proposed in Union County, South Carolina. A directory lists its capacity at 49 MW; no filing we hold states a figure. 3 other campuses are on record within 25 miles. The nearest is 18.5 mi away, measured between approximate points.

Nearest of each kind: Permitted 18.5 mi Proposed 22.5 mi

Nearest campuses on record

What is on record

Owner

Owner not independently traced

Listed as Volt Edge Energy by Cleanview, DataCentersExposed. We have not verified that against a filing.

What the signal was
  1. dce directory attribution

    Volt Edge Energy

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026

Filed by: Volt Edge Energy

Capacity
49 MW as reported by cleanview, not from a filing
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Project Alpaca · Volt Edge Energy

How the status changed

  1. Proposed Jun 18, 2026 inferred

    DCE status 'proposed'

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  2. Proposed Sep 8, 2026 inferred

    Cleanview status 'Planned'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

About this data

Evidence

Directory listing only

One or more public directories list it. We have not matched it to a filing.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.

Independent sources

1

directory. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.