Fermi Project Matador - Expansion (Nuclear AP1000)
Carson County, Texas
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 4,400 MW directory claim
- Location known to
- Approximate area
- County
- Carson County
- State
- Texas
- Electric utility
- Southwestern Public Service Co
- Grid operator
- SPP
Location and nearby
Fermi Project Matador - Expansion (Nuclear AP1000) is on record as proposed in Carson County, Texas. A directory lists its capacity at 4,400 MW; no filing we hold states a figure. 4 other campuses are on record within 25 miles, 2 of them within 5 miles. The nearest is 3.0 mi away, measured between approximate points.
Nearest of each kind: Operating 13.8 mi Under construction 3.0 mi Proposed 4.5 mi
Nearest campuses on record
- 3.0 mi approximate
Fermi America HyperGrid/ Project Matador
Under construction · Carson County, TX
- 4.5 mi approximate
Fermi Project Matador East - Expansion (Gas)
Proposed · Carson County, TX
- 13.8 mi approximate
Operating · Potter County, TX
- 14.5 mi approximate
Operating · Potter County, TX
What is on record
Owner
Owner not resolved
- Capacity
- 4,400 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- Southwestern Public Service Co
- Also recorded as
- Fermi Project Matador - Data Center 1 · Fermi Project Matador - Expansion (Gas) · Fermi Project Matador - Expansion (SMR)
How the status changed
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
4 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=1964 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=1965 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=4490 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=732 | Sep 8, 2026 retrieved by us |
Cleanview (cleanview.co)
Free email alerts
Know first when a data center is recorded in Carson County
Each time we refresh the public records and a new campus appears in Carson County, you get one short email naming it, with the document behind it.