Cipher Mining Odessa Data Center
2200 E INTERSTATE 20
Exact coordinate
A permit or approval is on record. Construction may not have started.
Status inferred from epa frs active 518210 (Sun, 06 Se). No filing states it in as many words.
- Status
- Permitted (inferred)
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Exact coordinate
- County
- Ector County
- State
- Texas
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Cipher Mining Odessa Data Center is on record as permitted in Ector County, Texas. 3 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Operating 0.4 mi Proposed 13.7 mi
Nearest campuses on record
- 0.4 mi approximate
Operating · Ector County, TX
- 9.2 mi approximate
Operating · Midland County, TX
- 13.7 mi approximate
Texas Critical Ector Data Center
Proposed · Ector County, TX
What is on record
Owner
Owner not resolved
Filed by: CIPHER MINING ODESSA DATA CENTER
- Address on file
- 2200 E INTERSTATE 20
- Capacity
- not stated
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- CIPHER MINING ODESSA DATA CENTER
How the status changed
- Operating Jun 17, 2026 inferred
DCE status 'operating'
- Permitted Sep 6, 2026 inferred
epa frs active 518210
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Exact coordinate
A coordinate as filed with a government agency.
Independent sources
2
directory, federal permit. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| EPA ECHO Exporter, all facilities (weekly refresh) US | Primary | REGISTRY_ID=110071181368 | Sep 6, 2026 last changed on the server |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=cipher-mining-odessa-data-center-110071181368 | Jun 17, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Ector County
Each time we refresh the public records and a new campus appears in Ector County, you get one short email naming it, with the document behind it.