Aligned Project Caprock - LBB-01
Abernathy, Hale County, Texas
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not independently traced
- Capacity
- 108 MW directory claim
- Location known to
- Approximate area
- County
- Hale County
- State
- Texas
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Aligned Project Caprock - LBB-01 is on record as proposed in Hale County, Texas. A directory lists its capacity at 108 MW; no filing we hold states a figure. 2 other campuses are on record within 25 miles, 2 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Under construction 2.5 mi Proposed 0.4 mi
Nearest campuses on record
- 0.4 mi approximate
Fluidstack Abernathy Data Center
Proposed · Hale County, TX
- 2.5 mi approximate
Under construction · Hale County, TX
What is on record
Owner
Owner not independently traced
Listed as Aligned Data Centers by Cleanview, DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
Aligned Energy Holdings, LP
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026
Filed by: Aligned Energy Holdings, LP
- Capacity
- 108 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Aligned Energy Holdings, LP · Aligned Project Caprock - LBB-02 · Aligned Project Caprock - LBB-03 · Aligned Project Caprock - LBB-04 · Aligned Project Caprock - LBB-05 · Aligned Project Caprock - LBB-06 and 1 more
How the status changed
- Under construction Jun 18, 2026 inferred
DCE status 'under_construction'
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
7 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Hale County
Each time we refresh the public records and a new campus appears in Hale County, you get one short email naming it, with the document behind it.