QTS Turkey - Building 1
Hall County, Texas
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 91 MW directory claim
- Location known to
- Approximate area
- County
- Hall County
- State
- Texas
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
QTS Turkey - Building 1 is on record as proposed in Hall County, Texas. A directory lists its capacity at 91 MW; no filing we hold states a figure. 2 other campuses are on record within 25 miles. The nearest is 20.5 mi away, measured between approximate points.
Nearest of each kind: Operating 20.5 mi Under construction 24.2 mi
Nearest campuses on record
- 20.5 mi approximate
Operating · Briscoe County, TX
- 24.2 mi approximate
Project Dorothy 1A and 1B (Soluna)
Under construction · Briscoe County, TX
What is on record
Owner
Owner not resolved
- Capacity
- 91 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- QTS Turkey - Building 10 · QTS Turkey - Building 11 · QTS Turkey - Building 2 · QTS Turkey - Building 3 · QTS Turkey - Building 4 · QTS Turkey - Building 5 and 4 more
How the status changed
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
11 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.