QTS Data Center
14100 PARK VISTA BLVD
Parcel boundary
Recorded as in service.
Status inferred from osm footprint (Sep 8, 2026). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- QTS
- Capacity
- 39 MW directory claim
- Location known to
- Parcel boundary
- County
- Tarrant County
- State
- Texas
- Electric utility
- Not identified
- Grid operator
- ERCOT
Location and nearby
QTS Data Center is on record as operating in Tarrant County, Texas. A directory lists its capacity at 39 MW; no filing we hold states a figure. 36 other campuses are on record within 25 miles, 4 of them within 5 miles. The nearest is 0.35 mi away.
Nearest of each kind: Operating 0.35 mi Under construction 17.2 mi Permitted 9.8 mi Proposed 1.6 mi
Nearest campuses on record
- 0.35 mi
Meta data center, Fort Worth, TX
Operating · Tarrant County, TX
- 0.7 mi approximate
Tierpoint Fort Worth Data Center, Dallas
Operating · Tarrant County, TX
- 1.5 mi
Operating · Denton County, TX
- 1.6 mi approximate
PowerHouse Circle T - Building 1
Proposed · Tarrant County, TX
- 6.1 mi
Operating · Tarrant County, TX
- 9.7 mi approximate
Proposed · Tarrant County, TX
What is on record
Owner
QTS Strong
The chain
-
assessor parcel owner of record
QTS INVESTMENTS PROPERTIES FOR
Texas StratMap statewide land parcels (TxGIO) (point queries) · Sep 9, 2026
Filed by: QTS INVESTMENTS PROPERTIES FOR
Sources name more than one company here: Prime Data Centers, QTS. That usually means a building with tenants. No source we hold says which is the landlord, so we do not guess.
- Address on file
- 14100 PARK VISTA BLVD
- Capacity
- 39 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Prime Data Centers · QTS Fort Worth (FTW1) · QTS Fort Worth DC1 · QTS Fort Worth DC2 · Quality Technology Services
How the status changed
- Operating Jul 24, 2023 inferred
osm footprint
Overpass data_center query, tile conus-c1 bbox 24.0,-105.0,50.0,-95.0
- Operating Jun 16, 2026 inferred
DCE status 'mapped' (located only, single source)
- Operating Jun 17, 2026 inferred
DCE status 'mapped' (located only, single source)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Parcel boundary
Matched to an assessor parcel, so the boundary is the parcel.
Independent sources
3
assessor parcel, directory, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
6 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Tarrant County
Each time we refresh the public records and a new campus appears in Tarrant County, you get one short email naming it, with the document behind it.