Data centers in Douglas County

31 campuses are on record here. 1 more was withdrawn or rejected and is kept for the record.

Operating

13

Under construction

1

Permitted

2

Proposed

15

Rejected

1

All 32 on record here have a coordinate.

Every campus on record

Open the printable report for Douglas County

Data centers in Douglas County
Campus Status Owner Capacity
Aligned Data Centers ATL01 Operating (inferred) Aligned Data Centers not stated
ATL02 Atlanta Data Center Operating (inferred) STACK Infrastructure not stated
Atlanta III Data Center Operating (inferred) T5 Data Centers not stated
Data Canopy - Atlanta 1 Operating (inferred) not resolved not stated
Digital Realty Atlanta ATL11 Operating (inferred) likely Digital Realty not stated
Flexential Atlanta - Douglasville 1 Operating (inferred) Flexential not stated
Google data center, Douglas County, Georgia Operating (inferred) Google not stated
Google Douglas County directory listing, unverified Operating (inferred) not traced not stated
Google, LLC Operating (inferred) CenterSquare not stated
PWC Lithia Springs directory listing, unverified Operating (inferred) not traced not stated
Stream Atlanta West Data Center directory listing, unverified Operating (inferred) not traced not stated
Switch Data Center Operating (inferred) likely Switch not stated
T5 Atlanta III - Building 2 directory listing, unverified Operating (inferred) not resolved not stated
Microsoft East Point, Douglas County directory listing, unverified Under construction (inferred) not traced not stated
Amazon Data Services, Inc. ATL068 and ATL078 Campuses Permitted Amazon (AWS) not stated
Google, LLC Permitted (inferred) Google not stated
AWS Douglas County (Douglasville) directory listing, unverified Proposed (inferred) not traced not stated
AWS Rock House Road - Building 1 directory listing, unverified Proposed (inferred) not traced not stated
AWS West Strickland - Building 1 directory listing, unverified Proposed (inferred) not resolved not stated
DC Blox ATL West - Building 1 directory listing, unverified Proposed (inferred) not resolved not stated
Douglas Waldrop directory listing, unverified Proposed (inferred) not resolved not stated
Hickman Property directory listing, unverified Proposed (inferred) not traced not stated
Microsoft FTY01 - Building 1 directory listing, unverified Proposed (inferred) not resolved not stated
Stack ATL02A directory listing, unverified Proposed (inferred) not resolved not stated
Stack ATL02B directory listing, unverified Proposed (inferred) not resolved not stated
Stack ATL02C directory listing, unverified Proposed (inferred) not resolved not stated
Stack ATL02D directory listing, unverified Proposed (inferred) not resolved not stated
Stream Data Center directory listing, unverified Proposed (inferred) not resolved not stated
Stream Data Center: GA directory listing, unverified Proposed (inferred) not resolved not stated
Vantage Data Center directory listing, unverified Proposed (inferred) not resolved not stated
Vantage Douglasville - Building 1 directory listing, unverified Proposed (inferred) not resolved not stated
I-20/Liberty Road Data Center directory listing, unverified Rejected (inferred) not resolved not stated

Capacity

Megawatts are only as good as the source. These two lines are never added together.

On record from a filing
not stated
0 of 32 campuses
As reported by directories
3,136 MW
20 of 32 campuses, unverified