I-20/Liberty Road Data Center
Douglas County, Douglas County, Georgia
Approximate area
A decision-maker refused it.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Rejected (inferred)
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Approximate area
- County
- Douglas County
- State
- Georgia
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
I-20/Liberty Road Data Center is on record as rejected in Douglas County, Georgia. 106 other campuses are on record within 25 miles, 8 of them within 5 miles. The nearest is 1.4 mi away, measured between approximate points.
Nearest of each kind: Operating 1.5 mi Under construction 2.1 mi Permitted 8.7 mi Proposed 1.4 mi
Nearest campuses on record
- 1.4 mi approximate
AWS West Strickland - Building 1
Proposed · Douglas County, GA
- 1.5 mi approximate
Operating · Douglas County, GA
- 2.0 mi approximate
AWS Douglas County (Douglasville)
Proposed · Douglas County, GA
- 2.1 mi approximate
Microsoft East Point, Douglas County
Under construction · Douglas County, GA
- 2.2 mi approximate
Stream Atlanta West Data Center
Operating · Douglas County, GA
- 2.3 mi approximate
Proposed · Douglas County, GA
What is on record
Owner
Owner not resolved
- Capacity
- not stated
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Rejected Aug 19, 2026 inferred
AI GridWatch stage/outcome: denied|denied; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for I-20/Liberty Road Data Center: https://www.fox5atlanta.com/news/douglas-county-leaders-just-killed-massive-data-center-project US-GA | Context | url=https://www.fox5atlanta.com/news/douglas-county-leaders-just-killed-massive-data-center-project | Aug 19, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=douglas-county-i20-ga | Aug 19, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Douglas County
Each time we refresh the public records and a new campus appears in Douglas County, you get one short email naming it, with the document behind it.