Data centers in Clark County

27 campuses are on record here.

Operating

19

Permitted

2

Proposed

6

All 27 on record here have a coordinate.

Every campus on record

Open the printable report for Clark County

Data centers in Clark County
Campus Status Owner Capacity
Apple Las Vegas directory listing, unverified Operating (inferred) not traced not stated
CenturyLink Operating (inferred) likely Lumen Technologies not stated
CenturyLink Operating (inferred) not resolved not stated
DataBank Las Vegas LAS1 Operating (inferred) likely DataBank not stated
EdgeConneX LAS01 directory listing, unverified Operating (inferred) not resolved not stated
Fiberhub LAS1 Operating (inferred) likely Fiberhub not stated
Flexential Las Vegas - Downtown Operating (inferred) likely Flexential not stated
Flexential Las Vegas - North Operating (inferred) likely Flexential not stated
Google Operating (inferred) likely Google not stated
Google data center, Henderson, Nevada Operating (inferred) Google not stated
Jasmine Development LLC Operating (inferred) not resolved not stated
Las Vegas Campus - Phase 1 directory listing, unverified Operating (inferred) not resolved not stated
Switch Las Vegas 9 Operating (inferred) likely Switch not stated
Switch Las Vegas NAP 17 directory listing, unverified Operating (inferred) not resolved not stated
Switch Ltd Operating (inferred) Switch not stated
Switch Ltd Operating (inferred) Switch not stated
Switch Ltd. Operating (inferred) Switch not stated
Switch12 Operating (inferred) likely Switch not stated
Verizon North Las Vegas Operating (inferred) likely Verizon not stated
Jasmine Development LLC Permitted not resolved not stated
Novva Data Centers Permitted Novva Data Centers not stated
Google Henderson (proposed) directory listing, unverified Proposed (inferred) not traced not stated
Jet.AI directory listing, unverified Proposed (inferred) not resolved not stated
Jet.AI Moapa Data Center directory listing, unverified Proposed (inferred) not resolved not stated
Novva Data Center (site 2) directory listing, unverified Proposed (inferred) not resolved not stated
Switch Data Center directory listing, unverified Proposed (inferred) not resolved not stated
Townsite Solar 2 LLC directory listing, unverified Proposed (inferred) not traced not stated

Capacity

Megawatts are only as good as the source. These two lines are never added together.

On record from a filing
not stated
0 of 27 campuses
As reported by directories
1,656 MW
17 of 27 campuses, unverified