Texas
Data centers in Denton County
10 campuses are on record here.
Operating
6
Under construction
1
Proposed
3
Every campus on record
Open the printable report for Denton County
| Campus | Status | Owner | Capacity |
|---|---|---|---|
| Citigroup Technology Inc | Operating (inferred) | not resolved | not stated |
| CyrusOne DFW1 | Operating (inferred) | not resolved | not stated |
| CyrusOne DFW2 directory listing, unverified | Operating (inferred) | not resolved | not stated |
| Denton Data Center | Operating (inferred) | Core Scientific | not stated |
| Digital Realty DFW (4025 Midway Road) | Operating (inferred) | not traced | not stated |
| Digital Realty DFW26 | Operating (inferred) | not resolved | not stated |
| CoreWeave / Core Scientific Denton directory listing, unverified | Under construction (inferred) | not traced | not stated |
| Core Scientific Denton - South Hall 1 directory listing, unverified | Proposed (inferred) | not resolved | not stated |
| CoreWeave Denton TX | Proposed (inferred) | likely CoreWeave | not stated |
| Qumulus AI Denton Data Center directory listing, unverified | Proposed (inferred) | not traced | not stated |
Capacity
Megawatts are only as good as the source. These two lines are never added together.
- On record from a filing
- not stated
- 0 of 10 campuses
- As reported by directories
- 1,324 MW
- 8 of 10 campuses, unverified
Moratoriums and pauses
1 more reported, not verified. AI GridWatch records one with a news link rather than an ordinance, so we list it as their report and not as a fact: Denton (Proposed, Aug 5, 2026). AI GridWatch (aigridwatch.com), CC BY 4.0.