Hurricane Electric Fremont 1
760 Mission Court
Building outline
A permit or approval is on record. Construction may not have started.
- Status
- Permitted
- Owner
- Likely Hurricane Electric
- Capacity
- not stated
- Location known to
- Building outline
- County
- Alameda County
- State
- California
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Hurricane Electric Fremont 1 is on record as permitted in Alameda County, California. 136 other campuses are on record within 25 miles, 12 of them within 5 miles. The nearest is 1.1 mi away.
Nearest of each kind: Operating 4.1 mi Permitted 1.1 mi Proposed 4.5 mi
Nearest campuses on record
- 1.1 mi
Permitted · Alameda County, CA
- 1.4 mi
Permitted · Alameda County, CA
- 2.0 mi approximate
Permitted · Alameda County, CA
- 4.0 mi approximate
Permitted · Alameda County, CA
- 4.1 mi approximate
Stream Data Center: Santa Clara V
Operating · Santa Clara County, CA
- 4.5 mi approximate
Prologis Zanker Road - Building 1
Proposed · Santa Clara County, CA
What is on record
Owner
Likely Hurricane Electric
One circumstantial signal, not a document chain.
What the signal was
-
OSM operator tag
Hurricane Electric
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 · Apr 29, 2025
Filed by: Hurricane Electric
- Address on file
- 760 Mission Court
- Capacity
- not stated
- Building area
- 33,640 sq ft
- Diesel generators
- Air permit on record, 1 units 202946
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Hurricane Electric · Hurricane Electric - FMT1
Buildings and phases
2 distinct buildings, parcels or permits make up this campus.
| Name or address | Status | Permit | Area | Date |
|---|---|---|---|---|
| Hurricane Electric Fremont 1 | Operating | not stated | not stated | Apr 29, 2025 |
| Hurricane Electric - FMT1 | Permitted | 202946 | not stated | Sep 8, 2026 |
How the status changed
- Operating Apr 29, 2025 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Jun 17, 2026 inferred
DCE status 'operating'
- Permitted Sep 8, 2026
Bay Area Air District: permitted and proposed data centers (phase 1): ATC
Bay Area Air District: permitted and proposed data centers (phase 1)
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Building outline
A mapped building outline.
Independent sources
3
directory, government record, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
3 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/383728972 | Apr 29, 2025 stated in the file |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=hurricane-electric-fremont-1-osmway-383728972 | Jun 17, 2026 last changed on the server |
| Bay Area Air District: permitted and proposed data centers (phase 1) US-CA | Primary | OBJECTID=202946 | Sep 8, 2026 retrieved by us |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Alameda County
Each time we refresh the public records and a new campus appears in Alameda County, you get one short email naming it, with the document behind it.