Prime Data Centers SJC01 (Hayward)
Hayward, Alameda County, California
Approximate area
Recorded as in service.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Owner not independently traced
- Capacity
- 20 MW directory claim
- Location known to
- Approximate area
- County
- Alameda County
- State
- California
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Prime Data Centers SJC01 (Hayward) is on record as operating in Alameda County, California. A directory lists its capacity at 20 MW; no filing we hold states a figure. 157 other campuses are on record within 25 miles, 4 of them within 5 miles. The nearest is 0.0 mi away, measured between approximate points.
Nearest of each kind: Operating 10.1 mi Permitted 0.0 mi Proposed 0.3 mi
Nearest campuses on record
- 0.0 mi approximate
Amazon Data Services, Inc - SFO11
Permitted · Alameda County, CA
- 0.3 mi approximate
STACK Infrastructure SVY03A Data Center Campus
Proposed · Alameda County, CA
- 0.53 mi approximate
Permitted · Alameda County, CA
- 1.7 mi approximate
Permitted · Alameda County, CA
- 5.6 mi approximate
Permitted · Alameda County, CA
- 8.3 mi approximate
Amazon Com Services Inc OAK5 7
Permitted · Alameda County, CA
What is on record
Owner
Owner not independently traced
Listed as Prime Data Centers by DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
Prime Data Centers
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 21, 2026
Filed by: Prime Data Centers
- Capacity
- 20 MW as reported by dce, not from a filing
- Building area
- 145,850 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Prime Data Centers
How the status changed
- Operating Jun 21, 2026 inferred
DCE status 'operating'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=prime-data-centers-sjc01-hayward | Jun 21, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Alameda County
Each time we refresh the public records and a new campus appears in Alameda County, you get one short email naming it, with the document behind it.