1265 BORREGAS AVENUE
Approximate area · address as filed, the pin is approximate
A permit or approval is on record. Construction may not have started.
- Status
- Permitted
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Approximate area
- County
- Santa Clara County
- State
- California
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Google is on record as permitted in Santa Clara County, California. 136 other campuses are on record within 25 miles, 63 of them within 5 miles. The nearest is 0.25 mi away, measured between approximate points.
Nearest of each kind: Operating 1.3 mi Permitted 0.25 mi Proposed 1.4 mi
Nearest campuses on record
- 0.25 mi approximate
Permitted · Santa Clara County, CA
- 0.5 mi approximate
Permitted · Santa Clara County, CA
- 1.2 mi approximate
Permitted · Santa Clara County, CA
- 1.3 mi approximate
Operating · Santa Clara County, CA
- 1.3 mi approximate
Operating · Santa Clara County, CA
- 1.4 mi approximate
Permitted · Santa Clara County, CA
What is on record
Owner
Owner not resolved
Filed by: Google
- Address on file
- 1265 BORREGAS AVENUE as filed; the point is approximate
- Capacity
- not stated
- Diesel generators
- Air permit on record, 1 units 201975
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Google Caribbean
Buildings and phases
2 distinct buildings, parcels or permits make up this campus.
| Name or address | Status | Permit | Area | Date |
|---|---|---|---|---|
| Permitted | 201975 | not stated | Sep 8, 2026 | |
| Google Caribbean | Permitted | 25149 | not stated | Sep 8, 2026 |
How the status changed
- Permitted Sep 8, 2026
Bay Area Air District: permitted and proposed data centers (phase 1): Permitted
Bay Area Air District: permitted and proposed data centers (phase 1)
- Permitted Sep 8, 2026
Bay Area Air District: permitted and proposed data centers (phase 1): Permitted
Bay Area Air District: permitted and proposed data centers (phase 1)
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
government record. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Bay Area Air District: permitted and proposed data centers (phase 1) US-CA | Primary | OBJECTID=201975 | Sep 8, 2026 retrieved by us |
| Bay Area Air District: permitted and proposed data centers (phase 1) US-CA | Primary | OBJECTID=25149 | Sep 8, 2026 retrieved by us |
Free email alerts
Know first when a data center is recorded in Santa Clara County
Each time we refresh the public records and a new campus appears in Santa Clara County, you get one short email naming it, with the document behind it.