Skip to the content
Data Centers Near Me
Permitted Miami-Dade County · FL

Quality Technology Services

11234 NW 20TH ST

Approximate area · address as filed, the pin is approximate

A permit or approval is on record. Construction may not have started.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Permitted
Owner
QTS
Capacity
3.4 MW directory claim
Location known to
Approximate area
County
Miami-Dade County
State
Florida
Electric utility
Not identified
Grid operator
not stated

Location and nearby

Quality Technology Services is on record as permitted in Miami-Dade County, Florida. A directory lists its capacity at 3.4 MW; no filing we hold states a figure. 16 other campuses are on record within 25 miles, 7 of them within 5 miles. The nearest is 0.1 mi away, measured between approximate points.

Nearest of each kind: Operating 0.1 mi Permitted 1.3 mi Proposed 2.6 mi

Nearest campuses on record

What is on record

Owner

QTS Strong

The chain
  1. permittee name as filed with EPA

    QUALITY TECHNOLOGY SERVICES

    EPA ECHO Exporter, all facilities (weekly refresh) · Sep 6, 2026

Filed by: QUALITY TECHNOLOGY SERVICES

Address on file
11234 NW 20TH ST as filed; the point is approximate
Capacity
3.4 MW as reported by cleanview, not from a filing
Diesel generators
Air permit on record FL0000001202501286
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
QTS Miami · QTS Miami (MIA1) · QUALITY TECHNOLOGY SERVICES

How the status changed

  1. Operating Jun 17, 2026 inferred

    DCE status 'mapped' (located only, single source)

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  2. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  3. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.

Independent sources

2

directory, federal permit. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

4 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=2149 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=qts-miami-mia1-pdb-582 Jun 17, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110040483660 Sep 6, 2026 last changed on the server
Census batch geocoder result, EPA area-precision batch 0 US census geocoder Non_Exact Corroborating id=110040483660 Sep 8, 2026 retrieved by us

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Miami-Dade County

Each time we refresh the public records and a new campus appears in Miami-Dade County, you get one short email naming it, with the document behind it.

Explore more