Skip to the content
Data Centers Near Me
Proposed (inferred) Bartow County · GA

Project Bunkhouse

Cartersville, Bartow County, Georgia

Approximate area

Someone has proposed it. Nothing has been approved and nothing is being built.

Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Proposed (inferred)
Owner
Owner not independently traced
Capacity
1,830 MW directory claim
Location known to
Approximate area
County
Bartow County
State
Georgia
Electric utility
Not identified
Grid operator
ERCOT

Location and nearby

Project Bunkhouse is on record as proposed in Bartow County, Georgia. A directory lists its capacity at 1,830 MW; no filing we hold states a figure. 13 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 0.3 mi away, measured between approximate points.

Nearest of each kind: Operating 13.9 mi Permitted 23.4 mi Proposed 0.3 mi

Nearest campuses on record

What is on record

Owner

Owner not independently traced

Listed as Gaines Family Land LLC by DataCentersExposed. We have not verified that against a filing.

What the signal was
  1. dce directory attribution

    Gaines Family Land LLC

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026

Filed by: Gaines Family Land LLC

Capacity
1,830 MW as reported by dce, not from a filing
Building area
8,600,000 sq ft
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Gaines Family Land LLC

How the status changed

  1. Proposed Jun 18, 2026 inferred

    DCE status 'proposed'

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

About this data

Evidence

Directory listing only

One or more public directories list it. We have not matched it to a filing.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.

Independent sources

1

directory. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=project-bunkhouse Jun 18, 2026 last changed on the server

© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Bartow County

Each time we refresh the public records and a new campus appears in Bartow County, you get one short email naming it, with the document behind it.

Explore more