Core Dalton 4
Dalton, Whitfield County, Georgia
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not independently traced
- Capacity
- 195 MW directory claim
- Location known to
- Approximate area
- County
- Whitfield County
- State
- Georgia
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Core Dalton 4 is on record as proposed in Whitfield County, Georgia. A directory lists its capacity at 195 MW; no filing we hold states a figure. 7 other campuses are on record within 25 miles, 4 of them within 5 miles. The nearest is 1.1 mi away, measured between approximate points.
Nearest of each kind: Operating 1.4 mi Proposed 1.1 mi
Nearest campuses on record
- 1.1 mi approximate
Core Scientific Dalton 4 (Old Tilton Rd)
Proposed · Whitfield County, GA
- 1.4 mi approximate
Core Scientific Dalton 3 (DNN3)
Operating · Whitfield County, GA
- 2.3 mi approximate
Core Scientific Dalton 1 (DNN1-2)
Operating · Whitfield County, GA
- 3.5 mi approximate
Proposed · Whitfield County, GA
- 5.9 mi approximate
Operating · Whitfield County, GA
- 21.4 mi approximate
Dixon Data Center/Project Sassy
Proposed · Floyd County, GA
What is on record
Owner
Owner not independently traced
Listed as CoreSite by DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
CoreSite, LLC
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026
Filed by: CoreSite, LLC
- Capacity
- 195 MW as reported by dce, not from a filing
- Building area
- 435,600 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- American Tower Corporation · CORE DALTON 4 · CoreSite, LLC
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=core-dalton-4 | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Whitfield County
Each time we refresh the public records and a new campus appears in Whitfield County, you get one short email naming it, with the document behind it.