Tract Morris Data Center
Morris, Grundy County, Illinois
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not independently traced
- Capacity
- 1,000 MW directory claim
- Location known to
- Approximate area
- County
- Grundy County
- State
- Illinois
- Electric utility
- Commonwealth Edison Co
- Grid operator
- PJM
Location and nearby
Tract Morris Data Center is on record as proposed in Grundy County, Illinois. A directory lists its capacity at 1,000 MW; no filing we hold states a figure. 12 other campuses are on record within 25 miles. The nearest is 6.2 mi away, measured between approximate points.
Nearest of each kind: Under construction 17.4 mi Proposed 6.2 mi
Nearest campuses on record
- 6.2 mi approximate
Proposed · Grundy County, IL
- 11.2 mi approximate
Aligned Project Star - Building 1
Proposed · Grundy County, IL
- 12.0 mi approximate
Western Hospitality Partners Data Center
Rejected · Will County, IL
- 16.6 mi approximate
PowerHouse Joliet - Building 7
Proposed · Will County, IL
- 16.9 mi approximate
Proposed · Will County, IL
- 17.2 mi approximate
PowerHouse Joliet - Building 1
Proposed · Will County, IL
What is on record
Owner
Owner not independently traced
Listed as Tract by Cleanview, DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
Tract
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026
Filed by: Tract
- Capacity
- 1,000 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- Commonwealth Edison Co
- Also recorded as
- Tract
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=2088 | Sep 8, 2026 retrieved by us |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=tract-morris-data-center | Jun 18, 2026 last changed on the server |
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Grundy County
Each time we refresh the public records and a new campus appears in Grundy County, you get one short email naming it, with the document behind it.