PowerHouse Data Centers
Jackson Twp/ Joliet, Will County, Illinois
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 1,800 MW directory claim
- Location known to
- Approximate area
- County
- Will County
- State
- Illinois
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
PowerHouse Data Centers is on record as proposed in Will County, Illinois. A directory lists its capacity at 1,800 MW; no filing we hold states a figure. 17 other campuses are on record within 25 miles, 3 of them within 5 miles. The nearest is 0.3 mi away, measured between approximate points.
Nearest of each kind: Operating 17.3 mi Under construction 0.6 mi Permitted 24.8 mi Proposed 0.3 mi
Nearest campuses on record
- 0.3 mi approximate
PowerHouse Joliet - Building 1
Proposed · Will County, IL
- 0.5 mi approximate
PowerHouse Joliet - Building 7
Proposed · Will County, IL
- 0.6 mi approximate
Under construction · Will County, IL
- 5.8 mi approximate
Proposed · Will County, IL
- 11.5 mi approximate
Proposed · Grundy County, IL
- 16.9 mi approximate
Proposed · Grundy County, IL
What is on record
Owner
Owner not resolved
- Capacity
- 1,800 MW as reported by dce, not from a filing
- Building area
- 3,468,000 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=powerhouse-data-centers | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.