Skip to the content
Data Centers Near Me
Proposed (inferred) St. Joseph County · IN

Anthropic-Amazon New Carlisle

New Carlisle, St. Joseph County, Indiana

Approximate area

Someone has proposed it. Nothing has been approved and nothing is being built.

Status inferred from agw source doc (Sun, 06 Se). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Proposed (inferred)
Owner
Likely Amazon (AWS)
Capacity
910 MW
Location known to
Approximate area
County
St. Joseph County
State
Indiana
Electric utility
Not identified
Grid operator
not stated

Location and nearby

Anthropic-Amazon New Carlisle is on record as proposed in St. Joseph County, Indiana. A record puts its capacity at 910 MW. 17 other campuses are on record within 25 miles, 5 of them within 5 miles. The nearest is 0.7 mi away, measured between approximate points.

Nearest of each kind: Operating 2.1 mi Under construction 0.7 mi Permitted 17.1 mi Proposed 1.7 mi

Nearest campuses on record

What is on record

Owner

Likely Amazon (AWS)

A tracker names this operator and cites a source we have not read ourselves, so it is not traced to a record.

What the signal was
  1. cited document names the operator

    amazon

    Source cited by AI GridWatch for AWS Northern Indiana expansion (New Carlisle): https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers · Aug 14, 2026

Filed by: AMAZON DATA SERVICES INCORPORATED

Capacity
910 MW from agw
Diesel generators
Air permit on record IN0000001814100650
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
AMAZON DATA SERVICES INCORPORATED · AWS Northern Indiana expansion (New Carlisle) · Amazon · Amazon (AWS)

How the status changed

  1. Proposed Aug 14, 2026 inferred

    AI GridWatch stage/outcome: operating|; source press

    Source cited by AI GridWatch for Anthropic-Amazon New Carlisle: https://drive.google.com/file/d/1BKiTFNUk2KDaUaiHG7fz0KlkNSBTHzbb/view?usp=sharing

  2. Proposed Aug 14, 2026 inferred

    AI GridWatch stage/outcome: operating|; source press

    Source cited by AI GridWatch for AWS Northern Indiana expansion (New Carlisle): https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers

  3. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway.

Independent sources

2

cited filing, federal permit, tracker lead. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

5 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Source cited by AI GridWatch for Anthropic-Amazon New Carlisle: https://drive.google.com/file/d/1BKiTFNUk2KDaUaiHG7fz0KlkNSBTHzbb/view?usp=sharing US-IN Context url=https://drive.google.com/file/d/1BKiTFNUk2KDaUaiHG7fz0KlkNSBTHzbb/view?usp=sharing Aug 14, 2026 retrieved by us
agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US Context id=anthropic-amazon-new-carlisle Aug 14, 2026 last changed on the server
Source cited by AI GridWatch for AWS Northern Indiana expansion (New Carlisle): https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers US-IN Context url=https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers Aug 14, 2026 retrieved by us
agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US Context id=aws-new-carlisle-in Aug 14, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110071949261 Sep 6, 2026 last changed on the server

AI GridWatch (aigridwatch.com), CC BY 4.0.

Free email alerts

Know first when a data center is recorded in St. Joseph County

Each time we refresh the public records and a new campus appears in St. Joseph County, you get one short email naming it, with the document behind it.

Explore more