Proposed (inferred) Leavenworth County · KS

Project Bluestem

Tonganoxie (Leavenworth County), Leavenworth County, Kansas

Approximate area

Someone has proposed it. Nothing has been approved and nothing is being built.

Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Proposed (inferred)
Owner
Owner not resolved
Capacity
600 MW
Location known to
Approximate area
County
Leavenworth County
State
Kansas
Electric utility
Not identified
Grid operator
SPP

Location and nearby

Project Bluestem is on record as proposed in Leavenworth County, Kansas. A record puts its capacity at 600 MW. 22 other campuses are on record within 25 miles. The nearest is 10.5 mi away, measured between approximate points.

Nearest of each kind: Operating 16.4 mi Permitted 11.8 mi Proposed 10.5 mi

Nearest campuses on record

What is on record

Owner

Owner not resolved

Filed by: Cloverleaf Infrastructure

Capacity
600 MW from agw
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Cloverleaf Infrastructure

How the status changed

  1. Proposed Aug 14, 2026 inferred

    AI GridWatch stage/outcome: in review|; source press

    Source cited by AI GridWatch for Project Bluestem: https://www2.ljworld.com/news/general-news/2026/aug/13/leavenworth-co-officials-reverse-course-slow-down-on-data-center-

About this data

Evidence

Directory listing only

One or more public directories list it. We have not matched it to a filing.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway.

Independent sources

1

tracker lead. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Source cited by AI GridWatch for Project Bluestem: https://www2.ljworld.com/news/general-news/2026/aug/13/leavenworth-co-officials-reverse-course-slow-down-on-data-center- US-KS Context url=https://www2.ljworld.com/news/general-news/2026/aug/13/leavenworth-co-officials-reverse-course-slow-down-on-data-center-proposed-for-site-near-tonganoxie/ Aug 14, 2026 retrieved by us
agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US Context id=tonganoxie-project-bluestem Aug 14, 2026 last changed on the server

AI GridWatch (aigridwatch.com), CC BY 4.0.

Free email alerts

Know first when a data center is recorded in Leavenworth County

Each time we refresh the public records and a new campus appears in Leavenworth County, you get one short email naming it, with the document behind it.

Explore more