Osawatomie Data Center
Osawatomie, Miami County, Kansas
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 150 MW directory claim
- Location known to
- Approximate area
- County
- Miami County
- State
- Kansas
- Electric utility
- Not identified
- Grid operator
- SPP
Location and nearby
Osawatomie Data Center is on record as proposed in Miami County, Kansas. A directory lists its capacity at 150 MW; no filing we hold states a figure. 5 other campuses are on record within 25 miles. The nearest is 17.7 mi away, measured between approximate points.
Nearest of each kind: Permitted 17.7 mi Proposed 22.4 mi
Nearest campuses on record
- 17.7 mi approximate
Edgerton Project - South Phase
Permitted · Johnson County, KS
- 17.7 mi approximate
Rejected · Johnson County, KS
- 18.6 mi approximate
Beale Infrastructure Gardner Hyperscale Campus
Withdrawn · Johnson County, KS
- 20.1 mi approximate
Withdrawn · Johnson County, KS
- 22.4 mi approximate
Proposed · Johnson County, KS
What is on record
Owner
Owner not resolved
- Capacity
- 150 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Alcove Development Data Center
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=2067 | Sep 8, 2026 retrieved by us |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=alcove-development-data-center | Jun 18, 2026 last changed on the server |
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Miami County
Each time we refresh the public records and a new campus appears in Miami County, you get one short email naming it, with the document behind it.