Muskie Data Campus Data Center
Ashland, Boyd County, Kentucky
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not independently traced
- Capacity
- 500 MW directory claim
- Location known to
- Approximate area
- County
- Boyd County
- State
- Kentucky
- Electric utility
- Kentucky Power Co
- Grid operator
- PJM
Location and nearby
Muskie Data Campus Data Center is on record as proposed in Boyd County, Kentucky. A directory lists its capacity at 500 MW; no filing we hold states a figure. 4 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 2.1 mi away, measured between approximate points.
Nearest of each kind: Proposed 2.1 mi
Nearest campuses on record
- 2.1 mi approximate
Proposed · Boyd County, KY
- 11.6 mi approximate
Strata AI Center of Excellence
Proposed · Lawrence County, OH
- 13.9 mi approximate
Google Franklin Furnace Data Center
Proposed · Scioto County, OH
- 19.4 mi approximate
Alpha Technologies Huntington Data Center
Proposed · Cabell County, WV
What is on record
Owner
Owner not independently traced
Listed as TeraWulf Inc. by DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
TeraWulf Inc.
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026
Filed by: TeraWulf Inc
- Capacity
- 500 MW as reported by dce, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- Kentucky Power Co
- Also recorded as
- TeraWulf Inc.
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=muskie-data-campus-data-center | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.