Oracle US / Realization Campus
2800 ROCKCREEK PKWY
Exact coordinate
A permit or approval is on record. Construction may not have started.
- Status
- Permitted
- Owner
- Oracle
- Capacity
- not stated
- Location known to
- Exact coordinate
- County
- Clay County
- State
- Missouri
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Oracle US / Realization Campus is on record as permitted in Clay County, Missouri. 51 other campuses are on record within 25 miles, 14 of them within 5 miles. The nearest is 1.9 mi away, measured between approximate points.
Nearest of each kind: Operating 1.9 mi Under construction 3.8 mi Permitted 7.9 mi Proposed 4.0 mi
Nearest campuses on record
- 1.9 mi approximate
Operating · Clay County, MO
- 2.0 mi approximate
Operating · Clay County, MO
- 2.2 mi approximate
Operating · Clay County, MO
- 3.8 mi approximate
Operating · Jackson County, MO
- 3.8 mi approximate
Operating · Jackson County, MO
- 3.8 mi approximate
Under construction · Jackson County, MO
What is on record
Owner
Oracle Strong
The chain
-
permittee name as filed with EPA
ORACLE US / REALIZATION CAMPUS
EPA ECHO Exporter, all facilities (weekly refresh) · Sep 6, 2026
Filed by: ORACLE US
- Address on file
- 2800 ROCKCREEK PKWY
- Capacity
- not stated
- Diesel generators
- Air permit on record MO0000002909502455
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- ORACLE 3200 DATA CENTER · ORACLE KC-7/8 DATA CENTERS · ORACLE US / REALIZATION CAMPUS · REALIZATION CAMPUS
How the status changed
- Permitted Sep 6, 2026
epa air permit active
- Permitted Sep 6, 2026
epa air permit active
- Permitted Sep 6, 2026
epa air permit active
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Exact coordinate
A coordinate as filed with a government agency.
Independent sources
1
federal permit. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
3 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| EPA ECHO Exporter, all facilities (weekly refresh) US | Primary | REGISTRY_ID=110064339434 | Sep 6, 2026 last changed on the server |
| EPA ECHO Exporter, all facilities (weekly refresh) US | Primary | REGISTRY_ID=110072142063 | Sep 6, 2026 last changed on the server |
| EPA ECHO Exporter, all facilities (weekly refresh) US | Primary | REGISTRY_ID=110072142064 | Sep 6, 2026 last changed on the server |
Free email alerts
Know first when a data center is recorded in Clay County
Each time we refresh the public records and a new campus appears in Clay County, you get one short email naming it, with the document behind it.