Nebius Independence campus
Independence, Jackson County, Missouri
Approximate area
A permit or approval is on record. Construction may not have started.
- Status
- Permitted
- Owner
- Likely Nebius
- Capacity
- 800 MW
- Location known to
- Approximate area
- County
- Jackson County
- State
- Missouri
- Electric utility
- Not identified
- Grid operator
- SPP
Location and nearby
Nebius Independence campus is on record as permitted in Jackson County, Missouri. A record puts its capacity at 800 MW. 49 other campuses are on record within 25 miles, 2 of them within 5 miles. The nearest is 4.8 mi away, measured between approximate points.
Nearest of each kind: Operating 5.2 mi Under construction 4.8 mi Permitted 7.9 mi Proposed 4.9 mi
Nearest campuses on record
- 4.8 mi approximate
Under construction · Jackson County, MO
- 4.9 mi approximate
Proposed · Clay County, MO
- 5.2 mi approximate
Operating · Jackson County, MO
- 5.3 mi approximate
Nebius Independence Campus - Building 1
Proposed · Jackson County, MO
- 5.5 mi approximate
LightEdge Kansas City Subtropolis (KCI1)
Operating · Clay County, MO
- 6.3 mi approximate
Google Kansas City East - Building 1
Proposed · Clay County, MO
What is on record
Owner
Likely Nebius
A tracker names this operator and cites a source we have not read ourselves, so it is not traced to a record.
What the signal was
-
cited government filing names the operator
nebius
Source cited by AI GridWatch for Nebius Independence campus: https://www.independencemo.gov/data-center-faqs · Aug 23, 2026
Filed by: Nebius
- Capacity
- 800 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Nebius
How the status changed
- Permitted Aug 23, 2026
AI GridWatch stage/outcome: approved|approved; source government
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
cited filing. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Nebius Independence campus: https://www.independencemo.gov/data-center-faqs US-MO | Primary | url=https://www.independencemo.gov/data-center-faqs | Aug 23, 2026 last changed on the server |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=nebius-independence-mo | Aug 23, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.