Nebius Data Center
Independence, Jackson County, Missouri
Approximate area
Building work is recorded as under way.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Under construction (inferred)
- Owner
- Owner not independently traced
- Capacity
- 880 MW directory claim
- Location known to
- Approximate area
- County
- Jackson County
- State
- Missouri
- Electric utility
- Not identified
- Grid operator
- SPP
Location and nearby
Nebius Data Center is on record as under construction in Jackson County, Missouri. A directory lists its capacity at 880 MW; no filing we hold states a figure. 38 other campuses are on record within 25 miles, 2 of them within 5 miles. The nearest is 1.6 mi away, measured between approximate points.
Nearest of each kind: Operating 9.1 mi Under construction 13.3 mi Permitted 4.8 mi Proposed 1.6 mi
Nearest campuses on record
- 1.6 mi approximate
Nebius Independence Campus - Building 1
Proposed · Jackson County, MO
- 4.8 mi approximate
Permitted · Jackson County, MO
- 9.1 mi approximate
Proposed · Clay County, MO
- 9.1 mi approximate
Operating · Jackson County, MO
- 9.5 mi approximate
LightEdge Kansas City Subtropolis (KCI1)
Operating · Clay County, MO
- 9.8 mi approximate
Google Kansas City East - Building 1
Proposed · Clay County, MO
What is on record
Owner
Owner not independently traced
Listed as Patmos by DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
Patmos
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026
Filed by: Patmos
- Capacity
- 880 MW as reported by dce, not from a filing
- Building area
- 2,500,000 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Patmos
How the status changed
- Under construction Jun 18, 2026 inferred
DCE status 'under_construction'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=nebius-data-center-2 | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Jackson County
Each time we refresh the public records and a new campus appears in Jackson County, you get one short email naming it, with the document behind it.