North Country Data Center
Massena, St. Lawrence County, New York
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 435 MW directory claim
- Location known to
- Approximate area
- County
- St. Lawrence County
- State
- New York
- Electric utility
- Not identified
- Grid operator
- NYISO
Location and nearby
North Country Data Center is on record as proposed in St. Lawrence County, New York. A directory lists its capacity at 435 MW; no filing we hold states a figure. 4 other campuses are on record within 25 miles, 3 of them within 5 miles. The nearest is 1.9 mi away, measured between approximate points.
Nearest of each kind: Operating 20.8 mi Proposed 2.1 mi
Nearest campuses on record
- 1.9 mi approximate
New York State Artificial Intelligence Data Center
Withdrawn · St. Lawrence County, NY
- 2.1 mi approximate
Proposed · St. Lawrence County, NY
- 2.6 mi approximate
Proposed · St. Lawrence County, NY
- 20.8 mi approximate
Operating · St. Lawrence County, NY
What is on record
Owner
Owner not resolved
- Capacity
- 435 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=2053 | Sep 8, 2026 retrieved by us |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=north-country-data-center | Jun 18, 2026 last changed on the server |
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in St. Lawrence County
Each time we refresh the public records and a new campus appears in St. Lawrence County, you get one short email naming it, with the document behind it.