AWS New Albany Campus 3 (expansion)
Licking County, Ohio
Approximate area
Building work is recorded as under way.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Under construction (inferred)
- Owner
- Owner not independently traced
- Capacity
- 1,100 MW directory claim
- Location known to
- Approximate area
- County
- Licking County
- State
- Ohio
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
AWS New Albany Campus 3 (expansion) is on record as under construction in Licking County, Ohio. A directory lists its capacity at 1,100 MW; no filing we hold states a figure. 96 other campuses are on record within 25 miles, 45 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Operating 0.68 mi Under construction 0.9 mi Permitted 0.4 mi Proposed 1.1 mi
Nearest campuses on record
- 0.4 mi approximate
Permitted · Franklin County, OH
- 0.68 mi approximate
Operating · Licking County, OH
- 0.80 mi approximate
Operating · Licking County, OH
- 0.85 mi approximate
Operating · Licking County, OH
- 0.9 mi approximate
EdgeConneX New Albany Data Center
Under construction · Licking County, OH
- 0.98 mi approximate
Operating · Licking County, OH
What is on record
Owner
Owner not independently traced
Listed as Amazon (AWS) by DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
Amazon Data Services, Inc.
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 14, 2026
Filed by: Amazon Data Services, Inc
- Capacity
- 1,100 MW as reported by dce, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Amazon Data Services, Inc. · Amazon.com, Inc.
How the status changed
- Under construction Jun 14, 2026 inferred
DCE status 'under_construction'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=amazon-new-albany-3 | Jun 14, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Licking County
Each time we refresh the public records and a new campus appears in Licking County, you get one short email naming it, with the document behind it.