QTS Nal 2 DC1
785 Beech Road Southwest
Parcel boundary
Recorded as in service.
Status inferred from osm footprint (Sep 8, 2026). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- QTS
- Capacity
- 59 MW directory claim
- Location known to
- Parcel boundary
- County
- Licking County
- State
- Ohio
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
QTS Nal 2 DC1 is on record as operating in Licking County, Ohio. A directory lists its capacity at 59 MW; no filing we hold states a figure. 97 other campuses are on record within 25 miles, 45 of them within 5 miles. The nearest is 0.2 mi away, measured between approximate points.
Nearest of each kind: Operating 0.2 mi Under construction 1.3 mi Permitted 0.4 mi Proposed 2.1 mi
Nearest campuses on record
- 0.2 mi approximate
New Albany Data Center - Socrates South
Operating · Licking County, OH
- 0.4 mi approximate
Montauk Innovations LLC (0145000570)
Permitted · Franklin County, OH
- 0.42 mi
Operating · Licking County, OH
- 0.43 mi
Operating · Licking County, OH
- 0.50 mi
Operating · Licking County, OH
- 0.51 mi
Operating · Licking County, OH
What is on record
Owner
QTS Strong
The chain
-
assessor parcel owner of record
QTS NEW ALBANY I LLC
Central Ohio parcels (City of Columbus GIS, 7 counties) (point queries) · Sep 9, 2026
Filed by: QTS NEW ALBANY I LLC
- Address on file
- 785 Beech Road Southwest
- Capacity
- 59 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- QTS NAL 2 DC1 · QTS NAL 2 DC2 · QTS New Albany NAL2-DC1 · QTS New Albany NAL2-DC2 · QTS Realty Trust, LLC · Quality Technology Services
Buildings and phases
2 distinct buildings, parcels or permits make up this campus.
| Name or address | Status | Permit | Area | Date |
|---|---|---|---|---|
| QTS Nal 2 DC1 | Operating | not stated | not stated | Sep 7, 2025 |
| QTS Nal 2 DC2 | Operating | not stated | not stated | Sep 7, 2025 |
How the status changed
- Operating Sep 7, 2025 inferred
osm footprint
Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0
- Operating Sep 7, 2025 inferred
osm footprint
Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0
- Operating Jun 14, 2026 inferred
DCE status 'mapped' (located only, single source)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Parcel boundary
Matched to an assessor parcel, so the boundary is the parcel.
Independent sources
3
assessor parcel, directory, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
6 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.