Under construction (inferred) Beaver County · PA

Shippingport Bruce Mansfield Data Center/Project Phoenix

Shippingport, Beaver County, Pennsylvania

Approximate area

Building work is recorded as under way.

Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Under construction (inferred)
Owner
Owner not independently traced
Capacity
3,600 MW directory claim
Location known to
Approximate area
County
Beaver County
State
Pennsylvania
Electric utility
Not identified
Grid operator
PJM

Location and nearby

Shippingport Bruce Mansfield Data Center/Project Phoenix is on record as under construction in Beaver County, Pennsylvania. A directory lists its capacity at 3,600 MW; no filing we hold states a figure. 22 other campuses are on record within 25 miles, 2 of them within 5 miles. The nearest is 0.7 mi away, measured between approximate points.

Nearest of each kind: Operating 2.0 mi Permitted 19.6 mi Proposed 0.7 mi

Nearest campuses on record

What is on record

Owner

Owner not independently traced

Listed as Aligned Data Centers by DataCentersExposed. We have not verified that against a filing.

What the signal was
  1. dce directory attribution

    Aligned Energy Holdings, LP

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026

Filed by: Aligned Energy Holdings, LP

Capacity
3,600 MW as reported by dce, not from a filing
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Aligned Energy Holdings, LP

How the status changed

  1. Under construction Jun 18, 2026 inferred

    DCE status 'under_construction'

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

About this data

Evidence

Directory listing only

One or more public directories list it. We have not matched it to a filing.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.

Independent sources

1

directory. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=shippingport-bruce-mansfield-data-center-project-phoenix Jun 18, 2026 last changed on the server

© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Beaver County

Each time we refresh the public records and a new campus appears in Beaver County, you get one short email naming it, with the document behind it.