Starpointe Industrial Park Data Center
Burgettstown, Washington County, Pennsylvania
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Approximate area
- County
- Washington County
- State
- Pennsylvania
- Electric utility
- FirstEnergy Pennsylvania Electric Co
- Grid operator
- PJM
Location and nearby
Starpointe Industrial Park Data Center is on record as proposed in Washington County, Pennsylvania. 26 other campuses are on record within 25 miles. The nearest is 5.7 mi away, measured between approximate points.
Nearest of each kind: Operating 12.4 mi Under construction 13.8 mi Permitted 14.7 mi Proposed 5.7 mi
Nearest campuses on record
- 5.7 mi approximate
Prime Data Centers, Starpointe Business Park campus
Proposed · Washington County, PA
- 12.4 mi approximate
Operating · Allegheny County, PA
- 12.6 mi approximate
Sammis Power Plant Data Center
Proposed · Jefferson County, OH
- 13.8 mi approximate
Shippingport Bruce Mansfield Data Center/Project Phoenix
Under construction · Beaver County, PA
- 13.9 mi approximate
Operating · Beaver County, PA
- 14.5 mi approximate
Aligned Project Phoenix - PIT-01
Proposed · Beaver County, PA
What is on record
Owner
Owner not resolved
- Capacity
- not stated
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- FirstEnergy Pennsylvania Electric Co
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=starpointe-industrial-park-data-center | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Washington County
Each time we refresh the public records and a new campus appears in Washington County, you get one short email naming it, with the document behind it.